A SERVICE OF

logo

DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-253ATM-SYNC (ATM Synchronization)
9
PPP Link Status Inquiry Test (#1279)
This non-destructive test determines the state of the PPP link. If the link is
connected, this test passes. The test fails if the PPP link is disconnected.
2500 ABORT Internal system Error.
1. Retry the command at 1-minute intervals a maximum of 3 times
FAIL All sessions on PPP link are down.
1. Test the port (test port UUCSSpp long) and verify the result of the
SCOTCH Synchronous Local Loop Around Test (#1275).
2. If the test fails, escalate the problem.
3. If the test passes wait for the sessions to come up.
PASS All sessions on PPP link are up.
Table 9-110. TEST #1279 PPP Link Status Inquiry Test
Error
Code
Te s t
Result Description/ Recommendation
1125 ABORT PPP Link is not in service.
1. Check if the PPP link is in-service or not. If the link is not in service,
release the link (release link
n
or release port UUCSSpp) and repeat
the test. This is a normal abort.
2100 ABORT The necessary system resources to execute the test could not be allocated.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2500 ABORT Internal system Error.
1. Retry the command at 1-minute intervals a maximum of 3 times
FAIL PPP link is down.
1. Test the port (test port UUCSSpp long) and verify the result of the
SCOTCH Synchronous Local Loop Around Test (#1275).
2. If the test passes wait for the link to come up.
PASS PPP link is up.
Continued on next page
Table 9-109. TEST #1287 Session Restart Test — Continued
Error
Code
Te st
Result Description/ Recommendation
Continued on next page