A SERVICE OF

logo

DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Commands
8-349test journal-printer
8
Output
test journal-printer
test journal-printer pms-log | wakeup-log
[short | long] [repeat number| clear] [schedule]
The test journal-printer command performs hardware diagnostics on the link
between the switch and a specified journal printer link to either the PMS-log
printer or the wakeup-log printer.
Parameters
One of the 2 journal printers must be specified:
Output
Background maintenance activity on a link can interfere with testing and
recovery of a particular component of the link. For example, as part of a test,
maintenance software may busy out a component of the link, causing the link to
drop. The system may then perform frequent attempts to re-establish the link.
This can delay recovery of the component, since it must be idle for certain tests
to take place. Busying out the link will prevent the system from these attempts to
set up the link. Remember that a busyout will tear down a link if it is not already
down.
Result
PASS - The test call was successfully initiated.
ABORT - Resources were not available (for example, a B-channel or
Maintenance/Test circuit pack).
FAIL - An outgoing test call could not be initiated.
pms-log
This specifies the link to the Property Management System printer,
whose maintenance name is PMS-PRNT.
wakeup-log
This specifies the wakeup-log printer, whose maintenance name is
JNL-PRNT.
Maintenance
Name
PMS-PRNT designates the PMS-log printer. JNL-PRNT designates the
wakeup-log printer.