
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Commands
8-225status bri-port
8
ASAI
BRI
0-126 Hyperactive ignore ignore Link has sent too many messages per
unit time. Signaling has been
suspended. After 60 seconds, the
system attempts to put the link into
service. If a link remains in this state
while there is no activity at the BRI
endpoint, take the following steps:
1. Make sure SPID administration on
the switch and endpoints are
consistent. Repeat status bri-port
to determine whether the Layer 2
state of the signaling link is
L3-Established. If it is not, go to
Step 2.
2. Try replacing the endpoint. Repeat
status bri-port to determine
whether the Layer 2 state of the
signaling link is L3-Established.
If it is not, follow normal escalation
procedures.
ASAI 0-126 L3-Restarting ext# The switch has sent a Restart message
to the adjunct but has not yet received a
Restart Acknowledgment message from
the adjunct.
ASAI 0-126 L3-Restarted ext# After receiving a Restart
Acknowledgment message, the switch
has sent a Heartbeat message to the
adjunct and is waiting for a response.
ASAI 0-126 L3-Established ext# This is the normal state for ASAI adjunct.
Table 8-10. Interpreting BRI-Port Status Reports — Continued
Error
Type
Aux
Data Associated Test
Alarm
Level
On/Off
Board Test to Clear Value
Continued on next page