A SERVICE OF

logo

DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Commands
8-207set options
8
Although adjuncts are administered as stations, the administration of alarm
severity for the station alarm group does not affect the alarm severity levels of the
adjuncts. Similarly, the administration of alarm severity for the adjunct alarm
group does not affect the alarm severity levels for other types of stations.
PGATE-PT and associated Link MOs Affected by
this Command
NOTE:
Although alarms on these MOs may appear as warnings, the alarms should
be investigated with user-related problems.
See
Packet Gateway Port (PGATE-PT)
for other Link associated MOs
affected by this Command
NOTE:
Although alarms on these MOs may appear as warnings, the alarms should
be investigated with user-related problems.
EPN Maintenance Circuit Pack (MAINT)
Expansion Interface (EXP-INTF)
ISDN-PRI Signaling Group (ISN-SGR)
Journal Printer (JNL-PRNT)
PMS Link (PMS-LINK)
PMS log printer (PMS-LOG)
Primary CDR Link (PRI-CDR)
Secondary CDR Link (SEC-CDR)
SPE Select Switches (SPE-SELEC)
Synchronization (SYNC)
Packet Gateway Port (PGATE-PT)
System Printer (SYS-PRNT)
TDM Clock (TDM-CLK)
Tone Generator Circuit Pack (TONE-BD)
Field Help
Since all fields on the first page may have the same values, then pressing HELP in
any field on the first page presents the following field help message:
m(inor) n(o) r(eport) w(arning) y(es)