DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-1051MET-LINE (MET Line)
9
MET Line Station Lamp Updates Test (#60)
For this test, the software lights the lamps on the terminal based on the status
record contained in the processor. The lamp updates run only if the station is
in-service.
PASS Hybrid Circuit and Conference Circuit Test passed. The hybrid circuitry is
transmitting properly.
1. If complaints persist, investigate by using other port tests, and by examining
the station, wiring, and connections.
0NO
BOARD
The test could not relate the internal ID to the port (no board). This could be due
to incorrect translations, no board is inserted, an incorrect board is inserted, or an
insane board is inserted.
1. Check to ensure that the board translations are correct. Use the list config
command, and resolve any problems that are found.
2. If the board was found to be correctly inserted in step 1, issue the busyout
board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should re-establish the linkage
between the internal ID and the port. If this is not the case, check to ensure
that there is a valid board inserted.
Table 9-417. TEST #60 MET Line Station Lamp Updates Test
Error
Code
Tes t
Result Description/ Recommendation
1 ABORT This port may have been busied out.
1. Look in the Error Log for Error Type 18 (port busied out) for this port. If this
error type is present, then release the port via the release station
<extension> command and run the test again.
2. Make sure that the terminal is connected.
3. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
Table 9-416. TEST #57 Hybrid Circuit and Conference Circuit Test — Continued
Error
Code
Tes t
Result Description/ Recommendation
Continued on next page