DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-1330PPP-PT (Control LAN Packet/Port)
9
SCOTCH Synchronous Looparound Test (#1275)
This test is destructive.
This test verifies the circuit in the datapath of a ppp call. This test fails if the data
transmitted on the port does not match the data received in the looparound
mode. Failure of this test indicates a port hardware fault on the circuit pack.
2100 ABORT Could not allocate the necessary system resources to run test.
1. Retry the command at 1-minute intervals, up to 5 times.
FAIL Received tones do not match transmitted tones.
1. Retry command at 1-minute intervals, up to 3 times.
2. If the problem persists, refer to TDM-BUS, Tone Generator, and Tone
Receiver repair procedures.
3. If the problem persists, replace the circuit pack.
PASS Port connections across the TDM bus function properly.
Table 9-519. TEST #1275 SCOTCH Synchronous Looparound Test
Error
Code
Te st
Result Description/ Recommendation
1000 ABORT The port is in use or PPP link is connected.
1. Determine when the port is available for testing (status clan-port
UUCSSpp).
2. If necessary, busyout the circuit pack (busyout port UUCSSpp).
3. Retry the test (#1275) when the port is idle.
1002 ABORT No TDM bus timeslots available for the test.
1. Retry the command at 1-minute intervals, up to 5 times.
1963 ABORT Firmware indicates that the port is in use or ppp link is connected.
1. Determine when the port is available for testing (status clan-port
UUCSSpp).
2. If necessary, busyout the circuit pack (busyout port UUCSSpp).
3. Retry the test (#1275) when the port is idle.
Continued on next page
Table 9-518. TEST #1285 TDM Looparound Test — Continued
Error
Code
Tes t
Result Description/ Recommendation
Continued on next page