
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Commands
8-341test hardware-group
8
test hardware-group
This command runs a series of demand maintenance tests on all hardware in a
specified group: a carrier, cabinet, port network, PNC (A or B), SPE, circuit pack
or the entire system. The tests executed vary depending on the options chosen
and types of hardware in the group. Some tests are run concurrently to speed
execution, so test results for several maintenance objects may be intermixed.
A hardware-group command running in the foreground can be aborted by
pressing
Cancel or by entering
cancel hardware-group
at another terminal. The
cancel command must be used for a test running in the background. You can
restart a canceled hardware-group test at the point it left off by entering
resume
hardware-group
. Hardware group tests started with the all-ports or
spe-interchange options can be resumed, but they will not always test every port
that originally would have been tested.
Feature Interactions
test hardware-group [system | carrier UUC | cabinet UU | port-network PN# |
pnc a-pnc | b-pnc | board UUCSS | spe]
[print | schedule]
Test
hardware-group
Only one "test hardware-group" command can be active at any given
time.
TTI If the test hardware-group command is issued with the all-ports
option while the TTI background task is active, some unadministered
ports may not be tested. In addition, active alarms on line ports may
be cleared by this task. The status tti command may be used to
determine the state of the TTI background task.
test fiber-link 1 b-pnc SPE B
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
1 B-PNC FIBER-LK 777 PASS
1 B-PNC FIBER-LK 759 PASS
1 B-PNC FIBER-LK 989 PASS
1 B-PNC FIBER-LK 237 PASS
1 B-PNC FIBER-LK 238 PASS
Command Successfully Completed