
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-1926VC-SUMPT
9
Error Log Entries and Test to Clear Values
Notes:
a. This port has been busied out with the
busyout port UUCSSpp
command.
b. The circuit pack has been removed or has been insane for more than
11-minutes. To clear the error, replace or reinsert the circuit pack.
c. The NPE Crosstalk Test(#1103) failed.
d. The VC Summer Port Local TDM Loopback Test(#1100) failed.
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the NPE Crosstalk Test, for example, you may also
clear errors generated from other tests in the testing sequence.
Table 9-712. VC-SUMPT Error Log Entries
Error
Type
Aux
Data Associated Test
Alarm
Level
On/Off
Board Test to Clear Value
0
1
1. Run the short test sequence first. If all test pass, run the long test sequence. Refer to the appropriate
test description and follow the recommended procedures.
0 Any Any Any test port UUCSSpp sh r 1
18 (a) 0 busyout port UUCSS WNG OFF release port UUCSSpp
130 (b) WNG ON test port UUCSSpp sh
257 (c) Any Control Channel Loop Test
(#52)
MIN ON test board UUCSSpp 1 r 3
513 (d) Any VC Summer Port Local
Loopback Test #(1100)
MIN ON test board UUCSSpp sh r 3
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive; ND = Nondestructive
NPE Crosstalk Test (#6) (a) X D
TDM Loopback Test (#1100) X X D