A SERVICE OF

logo

DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-167ATM-EI (Expansion Interface Circuit Pack)
9
ATM-EI-related commands
The following commands may be helpful in resolving ATM-EI problems:
Replacing an ATM-EI circuit pack
Standard Reliability
1. Enter
busyout atm-pnc
at the DEFINITY SAT.
2. Replace the ATM-PNC circuit pack.
3. Enter
release atm-pnc
.
4. Wait 2.5 minutes for board insertion (firmware download).
5. Enter
list sys-link
to verify that the links are up.
6. Enter
test board UUCSS
and verify that all tests pass.
High Reliability
There are 2 ATM-EI circuit packs in the PPN, 1 in the EPN.
1. Enter
busyout atm pnc
at the DEFINITY SAT.
2. Replace the circuit pack.
3. Enter release atm pnc.
4. Wait 2.5 minutes for board insertion (firmware download).
5. Enter list sys-link to verify that the links are up.
6. Enter test board UUCSS and verify that all tests pass.
add atm pnc list measurements atm
busyout/release atm pnc remove atm pnc
busyout/release board reset board
change system-parameters
customer-options (atm pnc)
status atm-pnc
change atm pnc
(pnc duplication)
status cabinet
display atm pnc status port-network
list atm oam-statistics test board
list atm pnc