A SERVICE OF

logo

DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-459DAT-LINE (Data Line Port)
9
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the
Digital Looparound Test,
for example, you may
also clear errors generated from other tests in the testing sequence. For
example, you may also clear errors generated from other tests in the testing
sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the selected
time slot and never crosses over to time slots reserved for other connections. If
the NPE is not working correctly, one-way and noisy connections may be
observed. This test is usually part of a port’s long test sequence and takes about
20 to 30 seconds to complete.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive; ND = Nondestructive
Digital Looparound Test (#171) X X ND
NPE Crosstalk Test (#6) X ND
Conference Circuit Test (#7) X ND
Audit Update Test (#36) X X ND
Table 9-191. TEST #6 NPE Crosstalk Test
Error
Code
Te s t
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000 ABORT System resources required to run test are not available. The port may be in
use on a valid call. Use status data-module to determine when the port is
available for testing.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1001 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page