
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-1292PMS-PRNT/JNL-PRNT (PMS Printer Link)
9
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the
Link Retry Test
, for example, you may also clear
errors generated from other tests in the testing sequence.
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external
printer device. If the link has been disconnected already, this test just returns
PASS. All resources allocated for a PMS Printer Link are released after this test.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive; ND = Nondestructive
Link Tear Down Test (#213) X D
Link Retry Test (#215) X X ND
Table 9-508. TEST #213 Link Tear Down Test
Error
Code
Tes t
Result Description/ Recommendation
40 ABORT Internal system error.
50 ABORT Internal system error.
1. Retry the command at one-minute intervals a maximum of 5 times.
1010 ABORT The link has been busied out to out-of-service.
1. Enter release journal wakeup-log|pms-log command to release the link
from busyout state.
2. Retry test journal wakeup-log|pms-log l command to execute the test.
2012 ABORT Internal system error.
1. Retry the command at one-minute intervals a maximum of 5 times.
FAIL Internal System error.
1. Retry the command at one-minute intervals a maximum of 5 times.
PASS The link is torn down.