
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Commands
8-339test fiber-link
8
The following display shows a typical result when
test environment 2
is entered
and cabinet 2 is a single carrier cabinet.
test fiber-link
The test fiber-link command validates that the optical fiber connection between
switch node interfaces (SNI) and expansion interfaces (EI), or a combination
thereof, are administered. If the fiber link is administered, a series of hardware
diagnostic tests are performed on the specified fiber link. The test results along
with any possible error codes are displayed on the MT. The long test sequence
test fiber-link# [a-pnc | b-pnc] [short | long]
[repeat # | clear] [schedule]
test environment 1
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01 POWER 5 PASS
01 AC-POWER 78 PASS
01E CARR-POW 127 PASS
01D CARR-POW 127 PASS
01A CARR-POW 127 PASS
01B CARR-POW 127 PASS
01C CARR-POW 127 PASS
01 EMG-XFER 124 PASS
01 CABINET 122 PASS
01 EXT-DEV 120 PASS
01 RING-GEN 117 PASS
01 RING-GEN 118 PASS
Command Successfully Completed
test environment 2
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
04 DC-POWER 79 PASS
04 EMG-XFER 124 PASS
04 EXT-DEV 120 PASS
04 RING-GEN 117 PASS
04 RING-GEN 118 PASS
Command Successfully Completed