DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-494DID-TRK (Direct Inward Dial Trunk)
9
Port Audit Update Test (#36)
This test sends updates of the DID port translation for all ports on the circuit pack
that have been translated. The update is non-disruptive and guards against
possible corruption of translation data contained on the circuit pack. No
response message is expected from the circuit pack once it receives translation
updates. The port translation data includes:
■ Wink or immediate start trunk
■ Dial tone or rotary dialing trunk
■ Rotary dialing inter-digit timing
■ Network balance R/RC
■ Disconnect timing
0NO
BOARD
The test could not relate the internal ID to the port (no board).
1. Check to ensure that the board translations are correct. Translate the
board, if necessary.
2. Issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board command. This should re-establish the linkage
between the internal ID and the port.
Table 9-203. TEST #36 Port Audit Update Test
Error
Code
Te s t
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
Table 9-202. TEST #35 Port Diagnostic Test — Continued
Error
Code
Tes t
Result Description/ Recommendation
Continued on next page