
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-1085MODEM-PT (Modem Pool Port)
9
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below when
inspecting errors in the system. By clearing error codes associated with the
Modem Pool Conference Test,
for example, you may also clear errors generated
from other tests in the testing sequence.
NOTE:
The tests in this section do not apply to Combined Modem Pool conversion
resources. The standard Digital Line and/or Analog Line port tests are run
on the ports associated with the Combined Modem Pool. Consult the test
descriptions for those maintenance objects when repairing Combined
Modem Pool arrangements.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive, ND = Non-destructive
Modem Pool NPE Crosstalk Test (#96) X D
Modem Pool Conference Test (#97) X D
Modem Pool Conversion Resource
Looparound Test (#98)
XXND
Modem Pool Audits Test (#99) X X ND