American Dryer Corp. AD-200 PHASE 7 Clothes Dryer User Manual


 
50
6) Mount the top of the control relay to the top of the din rail, then press down and snap the bottom into
the rail.
Set the overload to the setting specified on the dryer blueprints.
7) Inspect the work performed before reestablishing power (electrical power) to the dryer.
8) Reestablish electrical power to the dryer.