American Dryer Corp. MLG-460 Clothes Dryer User Manual


 
68
If arcing does not occur:
Check circuitry; refer to dryer Main Panel Wiring Diagram and dryer Solenoid Junction
Box Wiring Diagram.
Check transformer
Check spark igniter in burner
Refer to the ML-460 Service Manual (ADC Part No. 450023) for more information on the
burner controller module and burner start-up.
Retest
5b) To check the electrical actuation of the motorized gas valve:
Shut the main gas valve to the dryer.
Open the disconnect block on TB1-64, for circuit testing. With control voltage “ON” apply a
100 VAC a line to TB1-64 “output.” THE LOWER MOTORIZED GAS VALVE “V3” SHOULD
OPEN. ONCE THE “V3” IS OPEN THE SECOND MOTORIZED GAS VALVE “V2”
SHOULD OPEN.
NOTE: REMOVING THE VOLTAGE AT ANY TIME WILL CLOSE THE VALVES INSTANTLY.
If valves operate properly, close disconnect on TB1-64.
If the valves do not open correctly;
Check circuitry; refer to dryer Main Panel Wiring Diagram and MLG-464 Solenoid Junction
Box Wiring Diagram.
Check motorized valves
Refer to Section VI, Part D, Gas Burner and Ignition System on page 37 thru page 45.
Retest
6b) To verify that MS4 AUX is operational:
Start a drying cycle, MS4 contactor should pull in, and start the LINT FAN and LINT SCREEN
motors. Simultaneously MS4 AUZ1 should close, enabling MS8 Coil (Burner Fan Motor) to be
asserted by burner controller module. Does MS4 pull in?
If MS4 pulls in go to paragraph #7b
If MS4 “DOES NOT” pull in;
Check that PLC (Programmable Logic Controller) OUTPUT 3 L.E.D. (light emitting diode) is
“ON”
Check that fuse #14 L.E.D. (light emitting diode) “IS NOT” lit