American Dryer Corp. AD-200 Clothes Dryer User Manual


 
7
C. ADJUSTMENTS
7 DAYS AFTER INSTALLATION and EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, (bearing set screws), nonpermanent gas connections (i.e., unions, shut-off valves,
orifices), and grounding connections. Fan (impellor) V-belts, along with the motor and drive belts should
be examined and replaced if necessary. Tighten loose V-belts when necessary. Complete operational check
of controls and valves. Complete operational check of ALL safety devices (i.e., door switches, lint drawer
switch, sail switch, burner and hi-limit thermostats).