Alliance Laundry Systems H242I Washer/Dryer User Manual


 
504509 21
(Three-Wire Power Cord)
1. Remove the screw and terminal block access cover
from the rear of the dryer cabinet.
2. Insert ends of direct wire through power supply hole
(containing proper strain relief) in rear of dryer
cabinet. See following page. Connect the power cord,
or direct wiring, to the appropriate terminal block
terminals using the three wire-binding screws from
the accessories pack in the envelope shipped
inside the dryer cylinder. If the dryer had previously
been connected with a four-wire power cord, remove
the four-wire power cord by reversing procedures
under Four-Wire Power Cord instructions.
IMPORTANT: Use only a U.L. listed No. 10 AWG
(copper wire only) three conductor power supply cord
kit rated 240 Volts (minimum) 30 Amperes and
labeled as suitable for use in a clothes dryer.
3. Tighten these wire-binding screws firmly.
IMPORTANT: Failure to tighten these screws firmly
may result in wire failure at the terminal block.
4. Secure the strain relief to the power cord, or wires,
where they enter the dryer cabinet.
5. Check the continuity of the ground connection before
plugging the cord into an outlet. Use an acceptable
indicating device connected to the center grounding
pin of the plug and the ground screw on the back of
the cabinet.
6. Reinstall access cover and screw.
The dryer is grounded to neutral conductor
at the terminal block. If local codes do not
permit grounding through the neutral,
proceed as shown on
Four Wire Connection
instructions.
W174
To reduce the risk of electric shock,
disconnect the electrical service to the dryer
before proceeding.
W135
WARNING
D357IE3A
GROUNDING
PIN
INDICATING
DEVICE
(MUST SHOW
CONTINUITY)
GROUND SCREW
ON BACK
OF CABINET