Installation
EMM-E6 Installation Guide 3-9
Figure 3-4 EMM-E6 LANVIEW LEDs
9. After the system boot procedure, the CPU LED should be flashing
green, indicating proper EMM-E6 operation.
Proceed to Section 3.5, Connecting to the Network, to connect the
appropriate network segments to the EMM-E6 and individual EPIMs (for
connections to individual BRIMs, refer to the appropriate BRIM Guides).
CPU
RESET
STBY
RCV
XMT
CLN
ABCD
1926n04
ICH1Book Page 9 Tuesday, August 6, 1996 3:06 PM