Cabletron Systems EMM-E6 Washer User Manual


 
Chapter 3: Installation
3-6 EMM-E6 Installation Guide
Figure 3-2 Pre-Installation Test Configuration
3. Connect the first workstation to an EPIM that has been inserted in the
EMM-E6 EPIM slot 1.
4. Connect the second workstation to an active port on the Media
Interface Module that has been placed in the MMAC chassis.
5. Designate the first workstation as a file server and the second one as
the client (refer to individual workstation manuals for instructions on
assigning server/client relationships).
6. Send packets between the two workstations to verify the proper
operation of the EMM-E6.
If a failure occurs, contact Cabletron Systems Technical Support.
M3PSM
MMAC-M3FNB
M3FM
1926n06
ICH1Book Page 6 Tuesday, August 6, 1996 3:06 PM