Testing The Installation(continued)
4 Press the START button.
If everything is installed correctly:
• The green light on the start button will illuminate.
• The process and regeneration blowers turn on.
• The process and regeneration heaters turn on.
• If the desiccant tanks are not in their correct position, the carousel will
turn clockwise and stop in the correct position.
5 Press the STOP button.
If everything is installed correctly:
• The blowers will continue running as needed to cool the heaters.
6 The test is over. If the dryer performed the normal operating sequences as out-
lined, you can load the hopper and begin operation. If it did not, refer to the
T
ROUBLESHOOTING
section of the User Guide.
Stop
Start
3-18 l Installation
Central
• The regeneration heater turns on.