12 in. (30.48 cm)
needed to remove
optional aftercooler
coil for cleaning
3 in. (7.62 cm)
3 in. (7.62 cm)
Regeneration exhaust
high temperature
6 in. (15.24 cm)
6 in. (15.24 cm)
needed to change
filter
D-75 & D-100
Minimum
Clearance
6 in. (15.24 cm)
12 in. (30.48 cm)
needed to remove
optional aftercooler
coil for cleaning
3 in. (7.62 cm)
3 in. (7.62 cm)
Regeneration exhaust
high temperature
6 in. (15.24 cm)
needed to change
filter
D-15, D-25 & D-100
Minimum
Clearance
3-4 l Installation
Preparing for Installation
The D carousel dryer is easy to install if you plan the location and prepare the
mounting area properly.
1 Make sure the mounting area provides:
❒❒
A grounded power source supplying the correct current for your dryer
model. Check the dryer’s serial tag for the correct amps, voltage, phase, and
cycles. Field wiring should be completed by qualified personnel to the
planned location for the dryer. All electrical wiring should comply with your
region’s electrical codes.
❒❒
A source of water, if you have an aftercooler and / or precooler.
The D dryer’s optional aftercooler and precooler can use 1-2 gals./min. (3.8-
7.6 liters/min.) tower, city, or chiller water at temperatures of 40° to 85°F
(4° to 29°C). Pipe should be run to the planned dryer location. Use flexible
hose to connect the water pipes to the aftercooler and precooler. If the dryer
has an optional flow control, see Appendix D for connection information.
❒❒
Minimum clearance for safe operation and maintenance.
You should maintain 24 in. (61 cm) clearance on at least three sides of the
dryer. If the dryer is mounted with a hopper on a processing machine throat,
clearance between the dryer and hopper can be 4 in. (10.2 cm).