The time left shows in the display, or
the time left plus soak time or the de
-
lay start period.
In addition it serves as a display for
the programmable functions.
Delay start
A period of delay shows in the display.
After the appliance has started the de
-
lay start time counts down.
If a delay start is higher than 10 hours it
will count down hourly, from 9 h 59 it
will count down in minutes.
Once the delay start period is com-
pleted the programme begins and the
actual programme duration shows in
the display.
See the section "How to wash correctly
(Programme start)".
Time left display
At the beginning of a programme, the
maximum duration of a programme is
shown in hours and minutes, where de
-
lay start has not been selected.
In the Cottons, Minimum Iron and Mixed
Wash Poly/Cottons programmes the
type and volume of the wash will be
monitored during the first water inlet
phase. With a part load the time may
now be shortened by up to 60 minutes.
Soak
If a time is selected for soaking, this is
added to the prescribed running time
for the programme and the total shown
in the display.
Example:
The COTTONS 60°C programme is se
-
lected:
–
The display shows a programme run
-
ning time of 1 h 58.
–
A soaking time of one hour is cho
-
sen.
– The display shows a total running
time of 2 h 58. For more detailed in-
formation on soaking see the section
Additional options "Soak".
Display
32