Installation
F232135
24
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Machine Foundation
NOTE: Do not mount on wooden floors, above
ground level, or over basements or crawl spaces
because of the high extract speed and the G-forces
exerted.
The floor must be 3500 psi minimum reinforced
concrete set firmly in clean, compacted fill dirt.
The machine must be anchored to a smooth, level
surface so that the entire base of the machine is
supported and rests on the mounting surface. (Do not
support the machine on only four points.)
An elevated foundation must not exceed 8 inches
(203 mm).
Refer to Table 2 for foundation and anchoring
requirements.
Machine Foundation Requirements
Models
Foundation
Thickness
Floor
Thickness
Installation
Foundation
Method(s)
Anchoring
Method(s)
Requirement
Anchoring
Bolt
Diameter
Size
(minimum)
2 Speed and Fixed-Speed
(20-60 Models)
4
in.
(102 mm)
4 in.
(102 mm)
Direct-to-finished-floor,
elevated base frame, or
concrete foundation
Expansion bolt
or J-bolt
5/8 in.
Variable-Speed
(20-60 Models)
6 in.
(152 mm)
6 in.
(152 mm)
Direct-to-finished-floor
or concrete foundation
J-bolt or
mounting bolt
5/8 in.
Variable-
Speed
80 Models 9 in.
(229 mm)
6 in.
(152 mm)
Direct-to-finished-floor
or concrete foundation
J-bolt, mounting
bolt, or rebar
frame
3/4 in.
125 Models 12 in.
(304 mm)
6 in.
(152 mm)
Table 2