Before vou start
.
a - --~ -
Check location where dryers will be
used. Proper installation ls your
responsibility. The dryers must not be
installed or stored In an area where
they will be exposed to water and/or
weather. Make sure you have
everything necessary for correct
installation.
.a
Protection from weather: Pro1 )er
Important: Observe all
operation requlres temperah 1res
governing codes and
above 45°F (7.2%).
ordinances.
The wiring diagram Is locate< I
inslde the control panel and
acces panels.
Each of the dryers-b equipped with a
timer, selector switches and lndlcator
lights. The timers are set to provlde 45
minutes (4 pins) of drying time when
activatti by the coin slide. Timer
cams for 3&minute (6 pins) and 60-
minute (3 pins) drying time are supplied
with the unit in the parts bag. See
Pages 9 and 10 for timer cam
changing instructions.
’ Back-draft dampers
Dryers may be
exhausted from
bottom, rear, left or
right side. See ‘Exhaust
reauirements’, Page 6.
The coin slide mechanisms, control
-’
panel lock and key, coin box, and
coin box locks and keys are not
included and are available from
usual industry sources.
q
9
Power
supply cords
4 not supplied with unit.
Grounded electrical outlet Is
required. See ‘Electrical
>
requirements’, Page 3.
\
Location must be large
.:
enough to fully open dryer doors.
See Page 9 for recessed area
<
II
requirements and prduct
\
dimensions.
‘I
-‘\
II
Ill I
Check utilities: Proper
supply connections
must be available.
.!a& to support the total
/Iweight of 315 pounds per unit.
Personal Injury Hazard
More fhan one person Is
required to lift. tilt, or move the
dryers because of their weight
and size. Failure to follow these
instructions may result in
personal injury.
Fire Hazard
.’
.
d:r dryers - 1 Inch.
! LI !vel floor: Maximum floor slope
l
Do Not use or store gasoline,
paint, tb’nners and other
flammable materials near
dryers.
l
Never install dryers up against
draperies or curtains or on
carpet.
l
Keep any and all Items from
falling or collecting behlnd
the dryers.
l
Replace all access panels
before operating dryers.
Failure to follow these instructions
could result in a fire or explosion.
Page 2
h-4 -
7
Tools needed
for installatiton:
Phlltlps
v
flat-blade!
xrewdrlver
screwdrh er
Parts suppEed
for installat ion:
2 slide protectors
8 screw:
2 slide extensions
2 bolt and washer
2,30-mil lute cams
assemblies
2,60-mi lute corns
4, ?+I” good screws
Parts owner
must supply:
Parts may be ordered from
Greenwald Industries. Inc. or
Equlpment Systems and
Devices, Inc.
l
Greenwald Industti& Inc.
1340 Metropolitan Avenue
Brooklyn, NY 11237
telephone (7 18) 821 -WOO or
toll free (800) 221-0982
fax no. (718) 417-7412
l
Equipment Systems and
Devices, Inc.
1401 Dreshertown Road
. P.O. Box 618
1
I
/
( Dresher PA 19025
I telephone (215) 628-0860
fax no. (215) 643-4623
1 control panel lock and key
2
coin vaults and keys
E.S.D.
vault mud hove
projecting lock
2 coin slide m‘echanlsms (vertical 8)
j2
power cords