American Dryer Corp. ML-190HS Clothes Dryer User Manual


 
24
7. Reestablish electrical power to the dryer.
IMPORTANT: UNDER NO CIRCUMSTANCES should the door switch be disabled.
To Replace Main Door Assembly
1. Remove two (2) Allen head screws holding
the top main door hinge block to the front
panel.
2. Reverse this procedure for reinstalling new
main door assembly.
To Install New Main Door Glass
1. Remove main door assembly from dryer
(follow main door removal procedure).
2. Lay main door on flat surface with front of
door face up.
3. Remove the four (4) #10-32 Acorn nuts.
4. Remove glass and clean ALL old sealant off main door. This area must be completely cleaned for correct
bonding.
5. Apply a narrow bead of silicone (ADC P/N 170730) ALL around main door area where glass will rest.
6. Install glass onto door/adhesive and slightly press glass in place.
IMPORTANT: DO NOT press hard or silicone thickness between the glass and door will be
reduced, resulting in poor bonding.
7. Secure the four (4) #10-32 Acorn nuts to hold the glass.
8. The door assembly should now be put in an area where it will not be disturbed for at least 24 hours.
Depending on the conditions, the curing time of this adhesive is 24 to 36 hours.
9. After 24-hour curing period, install main door on dryer by reversing step 1.
To Replace Front Panel
1. Discontinue electrical power to the dryer.
2. Remove main door switch and bracket assembly.
3. Follow procedure for removal of main door assembly.
4. Open control (service) door.
5. Remove lint drawer and open lint door by removing six (6) screws.