American Dryer Corp. ADG-320D Clothes Dryer User Manual


 
26
EE. TO INSTALL NEW MAIN DOOR GLASS
1. Remove the main door assembly from the dryer (follow Main Door Removal Procedure in Section
DD).
2. Lay main door on flat surface with front of door face down.
3. Apply a narrow bead of silicone (ADC P/N: 170730)
ALL around the main door area where the glass will
rest.
IMPORTANT: This area must be completely cleaned for correct bonding.
4. Install the glass onto the door glass adhesive and slightly press glass in place.
IMPORTANT: DO NOT press hard or silicone thickness between the glass and the door will be
reduced resulting in poor bonding.
5. The door assembly should now be put in an area where it will not be disturbed for at least 24 hours.
Depending on the conditions, the curing time of this adhesive is 24 to 36 hours.
6. After the 24 to 36 hour curing period, reinstall main door onto the dryer.
FF. TO REPLACE MAIN DOOR GASKET
1. Open the main door completely.
2. Remove ALL existing main door gasket material with a putty knife or similar device. Make sure the door
surface is as clean as possible.
3. Apply a small bead of adhesive (ADC P/N: 170730) ALL around the main door gasket cavity area.
4. Gently push the gasket in place starting at the left side of the door (near the main door switch).
5. Dryer should be left out of operation for at least 8 hours.
GG. TO REPLACE MAIN DOOR HINGE
1. Discontinue power to the dryer.
2 Remove the lint drawer, the control/lint door, the control box, and the front panel from the dryer (follow
Control Box Removal Procedure in Section D).
NOTE: Before removing the front panel from the dryer, remove the main door assembly (follow Main
Door Removal Procedure in Section DD).