American Dryer Corp. AD-75V Clothes Dryer User Manual


 
26 American Dryer Corp. 113231-4
6. Steam Damper Air Piston (Flow Control) Operation Adjustment
Although the steam damper operation was tested and adjusted prior to shipping at 80 psi (5.51 bar), steam
damper operation must be checked before the dryer is put into operation. Refer to
page 25 for instructions
to check steam damper system operation. If steam damper adjustment is necessary, locate the flow
control valve and make the necessary adjustments as noted below.
I. FIRE SUPPRESSION WATER CONNECTION
BEFORE YOU START!
CHECK LOCAL CODES AND PERMITS
Call your local water company or the proper municipal authority for information regarding local codes.
IMPORTANT: It is your responsibility to have ALL plumbing connections made by a qualified
professional to assure that the plumbing installation is adequate and conforms to local,
state, and federal regulations or codes.
IMPORTANT: It is the installer’s or owner’s responsibility to see that the necessary or required
water, water pressure, pipe size, or connections are provided. The manufacturer
assumes no responsibility if the fire suppression system is not connected, installed, or
maintained properly.