American Dryer Corp. ADG / MLG-170DR Clothes Dryer User Manual


 
113409-2 www.amdry.com 9
IMPORTANT: The dryer must be installed in a location/environment, which the ambient temperature
remains between 40° F (4.44° C) and 130° F (54.44° C).
B. UNPACKING/SETTING UP
Remove protective shipping material (i.e., plastic wrap and/or optional shipping box) from dryer.
IMPORTANT: The dryer must be transported and handled in an upright position at ALL times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed. To remove the skid
from the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are
at the rear base, and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts located in the
lint chamber area, remove the lint drawer and the three (3) Phillips head screws securing the lint door in place.
1.
Leveling Dryer
a. To level the dryer, place 4-inch (10.16 cm) square metal shims or other suitable material under the base pads. It
is suggested that the dryer be tilted slightly to the rear (refer to the illustration above).
b. The V-belts are disconnected from the tumbler drive motor for shipping. Reconnect V-belts before starting the
dryer.