American Dryer Corp. ML-145 Clothes Dryer User Manual


 
13
C. DRYER ENCLOSURE REQUIREMENTS
Even though a 12-inch (30.48 cm) clearance is acceptable, it is recommended that the rear of the dryer be
positioned approximately 2 feet (0.61 meters) - 24-inches (60.96 cm) - from the nearest obstruction (i.e., wall) for
ease of installation, maintenance, and service. Bulkheads and partitions should be made from noncombustible
materials. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches
(10.16 cm) and must not extend more than 4-inches (10.16 cm) to the rear of the dryer front. A 2-inch (5.08 cm)
clearance is required between the bulkhead facing and the top of the dryer.
NOTE: Bulkhead facing should not be installed until after dryer is in place. Ceiling area must be
located a minimum of 6-inches (15.24 cm) above the dryer’s top console (module) for gas
models and 12-inches (30.48 cm) for steam models.
Even though a minimum of 6-inches (15.24 cm) above the dryer’s top console (module) is
acceptable for gas models and 12-inches (30.48 cm) above the dryer’s top console (module)
is acceptable for steam models, a clearance of 12-inches (30.48 cm) or more (for gas models)
and 18-inches (45.72 cm) or more (for steam models) is suggested for ease of installation and
service.
.
NOTE: When fire sprinkler systems are located above the dryers, a minimum of 12-inches (30.48 cm)
above the dryer’s top console (module) is required. Dryers may be positioned sidewall to
sidewall; however, 1 or 2-inches (2.54 or 5.08 cm) is suggested between dryers (or wall) for
ease of installation and maintenance. Allowances must be made for the opening and closing of
the control and lint door.