American Dryer Corp. ML-145 Clothes Dryer User Manual


 
12
IMPORTANT: The dryer must be transported and handled in an upright position at ALL times.
a. To Reconnect V-belts
1) Remove hardware holding the back (belt) guard and remove guard from the dryer.
2) Lay one (1) belt into motor sheave (pulley) groove and wind belt into corresponding groove of idler
pulley by rotating the idler pulley by hand. Rotate the idler pulley an extra turn or two (2) to insure
that the belt is tracking properly in the motor sheave (pulley) and idler pulley grooves without twisting.
3. If more headroom is needed when moving dryer into position, the top console (module) may be removed.
a. To Remove Top Console (Module)
1) Disconnect the ground wire (A) at the rear upper left hand corner of dryer.
2) Remove the eight (8) sets of nuts and washers (B) holding the console (module) to the base.
3) Disconnect white plug connector (C) located on top of the rear electric service/relay box (provides
power to the heat circuit).
4) Disconnect air connection from the 3-way micro valve.
5) Lift the console (module) off of the dryer base.