25
QUICK START UP PROCEDURE
will not have your grain moisture adjusted exactly where you want it, but
will be a good place to start initially. A little different moisture at the
bottom of the storage bin is not usually a problem as long as you have
full floor aeration.
11. After the run time in step 10 you are ready to adjust the moisture con-
trol,and the meter roll speeds if required. Each time you make an
adjustment to the moisture control, it will take the approximate time shown
in example #5 to see the results.
1100 SERIES CONTINUOUS FLOW METERING ROLL SETTINGS
Initial
Moisture
17%
18%
19%
20%
21%
22%
23%
24%
25%
26%
27%
28%
29%
30%
31%
32%
33%
34%
35%
2 Speed
High
875
775
675
575
476
385
317
270
241
213
196
185
172
161
150
140
132
123
116
2 Speed
Low
317
270
241
213
196
185
172
161
150
140
132
123
116
110
104
100
096
087
082
1 Speed
625
476
385
317
270
241
213
196
185
172
161
150
140
132
123
116
110
104
100
Approx.
Dry Time
16 min.
21 min.
26 min
31.5 min.
37 min.
41.5 min.
47 min.
51 min.
54 min.
58 min.
62 min.
66.5 min.
71.5 min.
76 min.
81 min.
86 min.
91 min.
96 min.
100 min.
Moisture
Removed
2 pts.
3 pts.
4 pts.
5 pts.
6 pts.
7 pts.
8 pts.
9 pts.
10 pts.
11 pts.
12 pts.
13 pts.
14 pts.
15 pts.
16 pts.
17 pts.
18 pts.
19 pts.
20 pts.
Full Heat
These are approximate starting points.