Firebox Installation (insert application only)
Refer to 975ZCK installation manual for ZC rebox installation.
To aid chimney liner connection, it may be necessary to rst remove the vent collar connector from the top of the
rebox—see gure below.
Remove the burner module from the rebox.
Insert the convection box into the replace opening feeding the supply pipe through hole at back or side of the
rebox.
Mark the replace oor through the two slots in the base of the convection box (see gure below) and remove
the convection box. Drill two holes in the replace oor at the marked positions using a no.12 masonry drill.
Insert a wall plug into each hole.
Secure the collar on the vent connector unit to the 4” diameter chimney liner.
Slide the rebox into the replace making sure that the vent connection unit is above the convection box. Leave
the rebox front a few inches clear of the replace front to allow you to x the vent connector to the top of the
rebox.
With the vent connector started in the cleat pull the vent connector towards the front of the replace. Fix the front
of the vent connector plate to the rebox front ange using the screw previously removed.
Push the convection box fully home against the front face of the replace. Make sure that no sags or dips occur
in the liner.
Fit a woodscrew through each slot in the convection box base and tighten.
Re-install the burner module and connect the gas supply line to the module.