—
18
—
7Remove the left reinforcing plate clamping screws (four PTT
screws 4 x 16, indicated by ●; one PPT screw 4 x 16, indicated
by ▲).
8Remove the right reinforcing plate clamping screws (four PTT
screws 4 x 16, indicated by ●; one PPT screw 4 x 16, indicated
by ▲).
9Remove the panel (front) clamping screws (five PTT screws
4 x 16, indicated by ●).
0Remove the cord clamping screw (one PTT screw 4 x 16,
indicated by ▲).
(7) Light emitting board (bottom)
1Perform the same work as in steps 1 through 6 of (5) above.
2Perform the same work as in steps 1 and 2 of (6) above.
3Remove the right side panel clamping screws (two PTT
screws 4 x 16, indicated by ●).
4Remove the left side panel clamping screws (two PTT
screws 4 x 16, indicated by ●).
5Remove the reactor clamping screw (one PTT screw 4 x16,
indicated by ▲).
6Remove the reactor (indicated by ).