Conair 15 Clothes Dryer User Manual


 
3-2 l Installation
Unpacking the Boxes
The D carousel dryer comes in one to four boxes, depending on the model and
options ordered. The boxes could include (depends on options selected):
1 Carefully remove the dryer and components from their shipping containers,
and set upright. Note that the dryer is secured to its shipping container with
four bolts that pass through the bottom of the dryer frame. These bolts are
accessed by removing the side panels of the dryer.
2 Remove all packing material, protective paper, tape, and plastic, including any
inserted in the top section of the dryer. Be sure to remove the side panels from
the dryer and cut and remove three (3) tie wraps securing the bedplates. Also
cut and remove the tie wrap on the bedplate limit switch.
3 Carefully inspect all components to make sure no damage occurred during
shipping, and that you have all the necessary hardware.
Mounting
Hardware:
Floor stand option:
four 5/16-18 self-locking
bolts
four hose clamps
Support frame option:
eight 3/8-16 self-locking
bolts
four 5/16-18 self-locking
bolts
four hose clamps
NOTE: You must posi-
tion the dryer on the
floor or mount it to a
floor stand if your pro-
cessing machine throat
opening is 1 inch (2.54
cm) diameter or small-
er and requires a 3x3
inch (7.6x7.6 cm) or
smaller bolt pattern.
RTD Probe
Hoses
D Carousel Dryer
Hopper
Support Frame
Mobile Floor Stand
Frame
with Casters
Slide Gate