Installing the MDC
The MDC was designed to be mobile. So every time you move the MDC, you will
need to mount the vacuum receiver, connect the main power source, and connect a
water source for the optional aftercooler. Phasing of electric power should be
consistant between locations.
The first time you install the MDC:
11
Move the MDC to the processing area. Lock the wheels on the drying cart.
22
Mount the vacuum receiver on the feed throat. Push the vacuum receiver
onto the mounting bracket.
3 Connect the conveying lines.
4 Connect the RTD probe.
5 Connect the demand sensor to the electrical enclosure of the dryer.
6 Connect the main power source.
7 Connect a source of water for the optional aftercooler.
Conveying lines
Demand
sensor
Vacuum receiver
Tools for
installation:
❒ Phillips screwdriver
❒ Flathead screwdriver
Central
When configured as
a central dryer, the
MDC option is not
available.
Appendix l G-9