Preventative Maintenance Schedule
See “Preventative Maintenance Checklist” page 5-2
Cleaning the Hopper
See “Cleaning the Hopper” page 5-3
Cleaning the Conveying Lines
This method should be used only after most of the material has been drained from
the drying hopper.
1 Disconnect the material line from the loader.
2 Place the disconnected hose inside a container.
3 Turn conveying on by setting the load time above zero. See page 4-6, Screen 9
Central
When configured as
a central dryer, the
MDC option is not
available.
Appendix l G-15