American Dryer Corp. ML-55HS Clothes Dryer User Manual


 
33
6. Steam Damper Air Piston (Flow Control) Operation Adjustment
Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI (5.52 bars), steam
damper operation must be checked before the dryer is put into operation. Refer to the previous page for
instructions to check steam damper operation. If steam damper adjustment is necessary, locate the flow
control valve and make the necessary adjustments as noted below.