American Dryer Corp. ML-96HS Clothes Dryer User Manual


 
32
SECTION VII
PROCEDURE FOR FUNCTIONAL CHECK OF
REPLACEMENT COMPONENTS
Hot Surface Ignition (HSI) System
a. Upon completing installation of the replacement Hot Surface Ignition (HSI) module, reestablish power
to the dryer.
b. The HSI module's "red" indicator light will light up
for approximately 5 seconds (self check routine).
If the HSI module's "red" indicator light stays on
or flashes continuously, then the HSI module is
wired incorrectly or has failed.
c. Start the drying cycle.
d. The hot surface ignitor will turn on. After approxi-
mately 4 seconds the glo bar will shut off and the
gas valve will be energized. The flame should
now be established.
e. With the burner flame on, remove the flame sensor wire from the S2 terminal of the HSI module. The
burner flame must shut off immediately.
f. Stop the drying cycle, with the flame sensor wire still removed, restart the drying cycle.
g. The hot surface ignitor will turn on and after approximately 4 seconds the hot surface ignitor will shut off.
The gas valve will be energized and a burner flame should be evident for approximately 7 seconds and
then shut off.
h. The HSI module will attempt two (2) additional ignition trails after which the HSI module will lock out and
the "red" indicator light will flash continuously.
i. Functional check of the Hot Surface Ignition (HSI) module is complete. Replace the flame sensor wire
from the S2 terminal to the HSI module.