American Dryer Corp. ML-310 Phase 7 Clothes Dryer User Manual


 
10
EVERY 6 MONTHS
Change gear oil in tumbler shaft gear reducer.
1. Remove the drain plug (located at the bottom rear of the reducer).
2. After oil is completely drained, replace the drain plug.
3. Remove the vent plug and pour in 1.48 quarts (1.4 liters) of
Mobil Oil DTE HH5G (I.S.O. viscosity grade
460), SAE 90, or its equivalent.
C. ADJUSTMENTS
7 DAYS AFTER INSTALLATION and EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, (bearing setscrews), nonpermanent gas connections (i.e., unions, shutoff valves,
orifices), and grounding connections. Fan (impellor) V-belts, along with the motor and drive belts should be
examined and replaced if necessary. Tighten loose V-belts when necessary. Complete operational check of
controls and valves. Complete operational check of ALL safety devices (i.e., door switches, lint drawer switch,
sail switch, burner, and hi-limit thermostats).