C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of
12-inches (30.48 cm), 18-inches (45.72 cm) or more is recommended for ease of installation, maintenance, and
service, above the dryer outer top, except along the front of the dryer which may be partially closed in if desired.
The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.16 cm) and must
not extend more than 4-inches (10.16 cm) to the rear of the front. The bulkhead facing must not be closed in
ALL the way to the top of the dryer. A 1-inch (2.54 cm) clearance is required.
NOTE: Allowances must be made for opening the control door.
Dryers may be positioned sidewall to sidewall. However, a 1/16” (1.5875 mm) minimum allowance must be
made for opening and closing of the control and lint doors. It is suggested that the dryer be positioned about 2 feet
(0.61 meters) away from the nearest obstruction for ease of installation, maintenance, and service (to be measured
from the back guard). Refer to the illustration above for details.
NOTE: Air considerations are important for proper and efficient operation.
IMPORTANT: Even though a minimum of only 12-inches (30.48 cm) is required, 18-inches (45.72
cm) or more is suggested, especially in the cases where sprinkler heads are over the
dryers. The additional clearance is also advantageous for ease of installation and
service.