American Dryer Corp. AD-120ES Clothes Dryer User Manual


 
113386-14 www.amdry.com 43
SECTION VIII
PROCEDURE FOR FUNCTIONAL CHECK
OF REPLACEMENT COMPONENTS
1. Phase 7 Microprocessor Controller (Computer) Board
a. Upon completing installation of the replacement microprocessor controller (computer) board, reestablish
power to the dryer.
b. Start the drying cycle by pressing any of the preset cycles in letters A-F.
c. Verify that the applicable indicator lights on the microprocessor controller (computer) board are lit.
(Refer to the illustration below.)