Alliance Laundry Systems D715I Clothes Dryer User Manual


 
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Installation
510963
20
2. Remove the three screws holding the three wires
to the terminal block terminals. Save these
screws. Loosen the strain relief screw and pull
the cord or wires out through the rear of the
dryer.
Figure 20
3. Remove ground screw and save for use in Step 5.
Remove wire and use in Step 6.
Figure 21
4. Use a strain relief and insert end of power cord
through power supply hole.
Figure 22
5. Attach power cord ground (green) wire to rear
bulkhead using ground screw removed in Step 3.
Figure 23
6. Use the three screws from the envelope located in
the cylinder to attach the remaining power cord
wires to the terminal block as follows:
a. Red wire to “L1” terminal.
b. Black wire to “L2” terminal.
c. White wire to Neutral terminal.
NOTE: When installing the white wire, loop the
free eyelet end of the ground wire (removed in
Step 3) and attach along with the white wire to the
neutral (center) terminal on the terminal block.
7. Tighten all screws firmly.
IMPORTANT: Failure to tighten these screws
firmly may result in wire failure at the terminal
block.
8. Check the continuity of the ground connection
before plugging the cord into an outlet. Use an
acceptable indicating device connected to the
center grounding pin of the plug and the green
screw on the back of the cabinet.
9. Reinstall access cover and screw.
D696I
D697I
1 Ground Screw
D698I
1 Power Cord Ground Wire
D697I
1
D698I
1
DRY1920N
1 White
2 “L2” Terminal
3 Black
4 Green
5 Red
6 Neutral Terminal
7 “L1” Terminal
DRY1920N
5
7
1
2
4
6
3