A SERVICE OF

logo

Optional Shelving
Shelves are shipped separately. To place shelving,
hold shelf straight and fit brackets straight into
channel. Place shelf directly above light outlet.
Plug in light making certain the plug is fully
engaged. All cases with shelf lights are equipped
with an interlocking plug system. Shelf lights will not
operate if plugs are not fully seated.
NOTE: If the shelf light is not in use, the plug
attached to the receptacle must be fully seated.
Installation Checklist
Before supplying electrical power and starting
case check the following:
1. Compressor Area (For Self-contained cases).
Remove shipping block on units with semi-
hermetic compressors. Check location of
controls.
2. Evaporator Area.
Check to ensure evaporator fan pressure plates
are secure and in proper position NOTE: Hinged
portion of pressure plates are secured for
shipping with mounting screws. Screws do not
have to be removed for case operation but must
be removed to use hinge.
3. Lighting System
Check to ensure male plugs are completely
inserted in female sockets and that all lamps are
securely seated in light fixture.
4. Case Leveling
Visually check case. If lift glass is out of
adjustment or case looks out of square, use a
carpenter's level and shim as needed.
After supplying power to the case and starting unit:
1. Check to ensure all fans are operational.
2. Check all lights.
3. Check case temperature and adjust thermostat
as needed. See refrigeration section of this manual
for case settings.