Speed Queen SC50CE Clothes Dryer User Manual


 
51
M412616
PRELIMINARY OPERATING CHECKS
FINAL OPERATING CHECKS
Manual Dual Timer Tumbler
1. Set temperature selector to HIGH and set drying
and cool down selectors to their maximum
settings.
2. Press and hold in Push-to-Start Button for
approximately three (3) seconds. Motor will start,
heat system will turn on, drying indicator will light
and drying selector will rotate counterclockwise.
3. When drying selector reaches zero (0) heat
system will shut off, drying indicator will turn off,
cooling indicator will light and cooling selector will
rotate counterclockwise.
4. When cooling selector reaches zero (0) motor will
stop and cooling indicator will turn off indicating
drying cycle is finished.
Coin Operated Tumbler
1. Set temperature selector to HIGH.
2. Insert required amount of coins.
3. Press and hold in Push-to-Start Button for
approximately three (3) seconds. Motor will start
and heat system will turn on.
4. Near end of cycle a preset 2 1/2 minute cool down
cycle will start.
5. When metered time expires, motor will stop
indicating drying cycle is finished.
Electronic Control Tumbler
Tumbler comes equipped with Electronic Control.
Electronic Control gives owner a variety of
programming options. To learn how to use Electronic
Control, consult supplemental manual.
1. Remove or open all panels and inspect accessible
bolts, nuts, screws, terminals and fittings for
security.
2. Check belt tension, adjust if necessary (refer to
Adjustment Section).
3. Energize electrical circuit to tumbler circuit
breaker and turn on tumbler disconnect switch.
4. Turn on gas supply at manual gas shut off valve in
gas supply line (gas models only). Handle of gas
shut off valve should be parallel with gas supply
line when in ON position.
5. Press and hold in Push-to-Start Button for
approximately three (3) seconds. Release button
and open cylinder door. Cylinder should stop
rotating within seven (7) seconds after door is
opened 3" (7.5 cm) plus or minus 1/4" (0.635 cm).
If cylinder does not stop rotating, adjust cylinder
door interlock (refer to Adjustment Section).
6. Load tumbler with clothes or clean rags.
7. Start tumbler and check burner flame, adjust gas
inlet shutter if necessary (refer to Adjustment
Section).
8. Check air flow switch operation by opening lint
panel. Heating system should shut off when
lint panel is opened approximately 1-1/2"
(3.81 cm). Adjust if necessary (refer to
Adjustment Section).
9. Turn off tumbler.
10.Check air flow switch operation by opening lint
panel. Heating systems should shut off when lint
panel is opened approximately 6" (15.24 cm) with
a full load.