Miele T 220 Clothes Dryer User Manual


 
Installation site
Building under a continuous work-
top / in a row of kitchen units
The space required by the vent duct
must be taken into consideration when
calculating the distance between the
machine and a wall or other appliances
or furniture on either side.
A special conversion kit* is re
-
quired.
The machine lid is replaced by a
coverplate which must be fitted by
suitably qualified person to ensure
electrical safety. This kit is supplied
with installation instructions.
When installing under a 900/910 mm
high worktop a spacer kit* is re-
quired.
Flat type ducting* is required if there
is not enough space for a vent duct.
The electric socket must be located
in an accessible position near the
machine.
When built under running times may be
longer.
NOTE:
If you wish to push your machine under
a worktop and there is space to do this
without removing the lid, the coversion
kit is not necessary. Otherwise the con
-
version kit is essential.
When building under allow for 625 mm
to include hoses, lid, facia and door.
When building the machine in behind
cabinet doors, ensure that doors are
open during operation for adequate
ventilation.
Replacing the lid
If the lid has been removed in order to
fit a cover plate, ensure that, if the lid is
replaced, it fits securely into the rear
holders. Otherwise, it is not properly se
-
cure for transport.
Washer-dryer stack
The tumble dryer can also be com
-
bined with a Miele washing machine in
a washer-dryer stack. To do this the ap
-
propriate stacking kit* (WTV) to match
your washing machine is required.
A washer and dryer should never be
stacked without using the proper stack-
ing kit. Doing so is extremely danger-
ous, as the dryer may vibrate off of the
washing machine during use.
All parts marked * are available from
the Miele Spare Parts or Sales
Departement, and must be fitted by a
suitably competent person according to
the instructions supplied with the kit.
Installation
26