American Dryer Corp. ML-75HS Clothes Dryer User Manual


 
24
The only electrical input connections to the dryer are the 3-phase (3Ø) power leads (L1,L2,L3 and
sometimes neutral) and ground. Single-phase (1Ø) power for the control circuit is done internally to
the dryer. No single-phase (1Ø) input connection is required on a three phase (3Ø) dryer.
For gas and steam dryers manufactured for operation at three phase (3Ø), the electrical connections
are made at the power distribution block located in the service box at the rear, upper left corner of the
dryer. The ground connection is made to the copper lug also provided in this box. To gain access to the
service box contactor, the service box cover must be removed.