American Dryer Corp. ML-75HS Clothes Dryer User Manual


 
12
NOTE: Allowances must be made for opening the control door.
Dryers may be positioned side wall to side wall. However, a 1/16" minimum allowance must be made for
opening and closing of the control door and the lint door. It is suggested that the dryer be positioned about two
(2) feet away from the nearest obstruction for ease of installation, maintenance, and service (to be measured
from the back guard.) (Refer to the illustration above for details.)
NOTE: Air considerations are important for proper and efficient operation.
IMPORTANT: Even though a minimum of only 12-inches is required, 18-inches or more is
suggested. The additional clearance is advantageous for ease of installation and
service.
IMPORTANT: When fire sprinkler systems are located above the dryers, a minimum of
18-inches above the dryer console (module) is required. Dryers may be
positioned side wall to side wall however, a 1/16-inch minimum allowance is
required between dryers (or wall) for ease of installation and maintenance.
Allowances must be made for the opening and closings of the control door and
the lint door.
C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of
twelve (12) inches (18-inches or more is recommended for ease of installation, maintenance , and service) above
the dryer outer top, except along the front of the dryer which may be partially closed in if desired. The clearance
between the bulkhead header and the dryer must be a minimum of four (4) inches and must not extend more
than four (4) inches to the rear of the front. The bulkhead facing must not be closed in all the way to the top of
the dryer. A one (1) inch clearance is required.