American Dryer Corp. ML-190 Clothes Dryer User Manual


 
11
C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions should be made of noncombustible material.
NOTE: Allowances must be made for opening the control door.
A 38-inches (96.52 cm) for optimum opening of load door.
B The maximum thickness of the bulkhead for gas dryers is 4-inches (10.16 cm). For electric and steam dryers
the maximum thickness of the bulkhead is 1-inch (2.54 cm) within 3-inches (7.62 cm) from the top of the
control door.
C For gas and electric dryers a minimum overhead clearance of 12-inches (30.48 cm) is required, providing no
sprinkler is located above the dryer. For steam dryers or if a sprinkler is located above the dryer, 18-inches
(45.72 cm) is required.
D Dryer should be positioned 12-inches (30.48 cm) away from the nearest obstruction and 24-inches (60.96
cm) is recommended for ease of installation, maintenance, and service.
E 2-inch (5.08 cm) minimum is required for opening the control door.
F Flooring should be level or below dryer cabinet for ease of removing panels during maintenance.
G Dryers may be positioned sidewall to sidewall, however a 1/16” (1.5875 mm) minimum allowance must be
made for the opening and closing of the control door, along with the removal of panels during maintenance.