User Manual Tx800 Installation
E-EQ-TX800OGWW-D-ARC 17
1 Check that the planned location of the computer meets ergonometric and field-of-vision requirement.
2 Ensure there is sufficient space underneath and above the Tx800 (easier to perform service/connect
and disconnect cables). There should be enough space behind the unit, making the passive cooling
work correctly.
3 Mark the positions of the holes on the mounting surface. See Figures 4 and 5 below.
5.5 mm holes
Figure 4 Locations of holes for 1.5” ball
8 mm holes
3 + 1 hole, 08 mm
Figure 5 Location of holes for 2.25” ball
4 Before drilling: Check behind/next to the presumed location for pre-installed electrical cabling, etc.
Verify placement with owner/manufacturer. Now drill holes for the attachment screws.
5 Firmly fasten the bracket onto the mounting surface using bolts.
Before mounting Tx800 onto the bracket, it’s easier to have all the wiring done, the
openable cable protection tube and the port lid in place.